ICESTA provided an integrated concrete cooling solution for the NEOM mega infrastructure project in Saudi Arabia, comprising a 120‑ton flake ice machine, a 90‑ton automatic ice storage system, and a 360‑ton water chiller. The entire system has been operating stably, ensuring continuous construction under extreme high‑temperature conditions.
This solution effectively addressed the client’s core challenges in large‑scale infrastructure construction:
The extreme heat in Saudi Arabia poses risks such as concrete cracking and insufficient strength due to excessive temperature;
The massive scale and tight schedule of the project demand a 24/7 uninterrupted supply of ice and chilled water;
Strict site conditions require equipment that is reliable, easy to maintain, and capable of long‑term continuous operation.
This solution effectively addressed the client’s core challenges in large‑scale infrastructure construction:
The extreme heat in Saudi Arabia poses risks such as concrete cracking and insufficient strength due to excessive temperature;
The massive scale and tight schedule of the project demand a 24/7 uninterrupted supply of ice and chilled water;
Strict site conditions require equipment that is reliable, easy to maintain, and capable of long‑term continuous operation.