Turnkey Solution   |   Advantage   |   Exhibition   |   Download Center   |   Service   |   Career  | FAQS

Testing & Validation

  • Do you conduct any environmental or noise testing for Icesta ice machines?

    Yes.
  • How long does testing take and what does the report include?

    Testing time depends on the model and the test scope. It can take from 1 day up to 1 week.
  • What is the sample requirement for validation testing of Icesta products?

    ICESTA can test or validate products to the requested standard when applicable.

    Key points:
    · Testing can be done in-house or through a qualified third-party lab.
    · ICESTA can confirm the test plan and acceptance criteria before testing starts.
  • Can Icesta test to {Standard} (ASTM/ISO/EN)?

    ICESTA can test or validate products to the requested standard when applicable.
     
    Key points:
    · Testing can be done in-house or through a qualified third-party lab.
    · ICESTA can confirm the test plan and acceptance criteria before testing starts.
  • Do you provide material certificates and lab test reports for Icesta products?

    ICESTA can provide material certificates and test reports when required.
     
    Key points:
    · This may include stainless steel certificates, component documents, and third-party lab reports.
    · Availability depends on the project and the requested documents.
  • What tests can Icesta perform for industrial ice machines (e.g., load/aging/corrosion)?

    ICESTA can run environmental tests (extreme temperature/humidity and vibration simulation), performance tests (ice output and energy use), durability tests (wear, corrosion, and mechanical stress cycling), and QA checks to meet applicable industry standards.

PRODUCTS

PRODUCTS

QUICK LINKS

CONTACT US

+86 13510956930

Yangchong Industry Zone, Shapu Songgang,Baoan District.Shenzhen.China

Leave a Message

SHENZHEN BROTHER ICE SYSTEM CO.,LTD © 2021 - ALL RIGHTS RESERVED